ISE April 2024 references

Augmented reality: Applying drone technology to improve project work
By Mohsin Al Taie and Diana J. Schwerha

 Ivan Sutherland, 1968, A head-mounted three-dimensional display, Thompson Book, 757-764.

 Shakil Ahmed, 2018, A Review on Using Opportunities of Augmented Reality and Virtual Reality in Construction Project Management, Organization, Technology and Management in Construction 2019; 11: 1839–1852.

 Ajang Behzadi, 2016, Using Augmented and Virtual Reality Technology in the Construction Industry, American Journal of Engineering Research (AJER) e-ISSN: 2320-0847 p-ISSN: 2320-0936 Volume-5, Issue-12, pp-350-353.

 Juan Manuel Davila Delgado, Lukumon Oyedele, Thomas Beachn, Peter Demian, 2018, Augmented and Virtual Reality in Construction: drivers and limitations for industry adoption.

 Sara Rankohi, Lloyd Waugh, 2013, Review and analysis of augmented reality literature for construction industry, Rankohi and Waugh Visualization in Engineering 2013, 1:9.

Alex Heinzel, Salman Azhar, Abid Nadeem, 2017, Uses of Augmented Reality Technology during Construction Phase, The Ninth International Conference on Construction in the 21st Century (CITC-9) “Revolutionizing the Architecture, Engineering and Construction Industry through Leadership, Collaboration and Technology” Dubai, United Arab Emirates.

Dr. Poorang Piroozfar, Mr. Amer Essa, Mr. Simon Boseley, Dr. Eric R. P. Farr, Dr. Ruoyu Jin, 2018, Augmented Reality (AR) and Virtual Reality (VR) in construction industry: An experiential development workflow, The Tenth International Conference on Construction in the 21st Century (CITC-10), Colombo, Sri Lanka.

Elena Ciampa, Luca De Vito, Maria Rosaria Pecce, 2019, Practical issues on the use of drones for construction inspections, Journal of Physics: Conference Series PAPER Journal of Physics: Conference Series, Volume 1249, XXVI AIVELA National.

Naveed Anwar, Muhammad Amir Izhar, Fawad Ahmed Najam, 2018, Construction Monitoring and Reporting using Drones and Unmanned Aerial Vehicles (UAVs), The Tenth International Conference on Construction in the 21st Century (CITC-10), Colombo, Sri Lanka.

R. Silva, J. C. Oliveira, G. A. Giraldi, 2003, Introduction to Augmented Reality.

Why and how to use drones in construction and infrastructure,2020, Scientific Article.

Andrew Lin, 2018, Use of Drone Technology on Commercial Construction Projects.

Industrial and systems engineering, the home of coordination expertise
By Richard J. Schonberger

Bicheno, J. and M. Holweg. 2023. “How to Calculate the Sigma Level of a Process,” in The Lean Toolbox: A Sourcebook for Process Improvement, 6th ed. (Buckingham England: PICSIE Books), pp. 109-110.

DiBono, P. 1997. Flow Manufacturing Improved Efficiency and Customer Responsiveness. IIE

Gilbreth, F.B., and Gilbreth, L.M. 1916. Fatigue Study. New York: Sturgis and Walton.

Huo, B., Gu, M., & Prajogo, D. 2016. Flow Manufacturing and Its Impacts on Operational Performance, Production Planning and Control, 27/15, 1233-1248.

Kosek., E.E., Thompson, R., & Lautsch, B.S. 2015. Balanced Workplace Flexibility: Avoiding the Traps. California Management Review, 57/4, 5-25.

Leavitt, Jeffrey S. 2022. “What a Doggone Journey,” Quality Progress, June, pp. 10-11.

Yuce, B., Packianather, M. S., Mastrocinque, E., Pham, D. T., & Lambiase, A. 2013. Honey Bees Inspired Optimization Methods: The Bees Algorithm. Insects, 4(4), 646-662. https://doi.org/10.3390/insects4040646

SHARE